Skip to content
Déménagements.ca

Déménagements.ca · Moving guides

Office Moves in Québec: Timeline, IT and Business Continuity

By Déménagements.caPublished 7 min read

A successful office move in Québec is planned months ahead and judged by one question: did your employees and clients notice an interruption? Getting there takes a designated lead, a precise inventory, confirmed building rules at both addresses, an IT plan and a change of address filed on time. Here is the method, step by step, for a Québec small or mid-sized business.

What timeline does an office move need?

Lead times depend on team size, fit-out work and IT complexity. The timeline below suits a mid-sized office; adjust it to your situation.

When

Key steps

6 months or more

Read the current commercial lease (notice, restoration obligations), choose the new premises, set the budget and appoint a lead

3 to 4 months

Floor plan, order internet and phone lines, request quotes from commercial moving companies

6 to 8 weeks

Book the movers, elevators and loading docks; labelled inventory; client communication plan

2 to 4 weeks

Backups, sorting and secure destruction of unneeded documents, boxes handed out to staff, change of address prepared

Final week

Confirm schedules, phone extension plan, a start-up kit for each employee

Moving day

Disassembly, loading by zone, IT reconnected first

Following week

Testing, fixing irritants, updating remaining addresses, returning the keys to the old premises

A commercial lease is not governed the same way as a residential lease: end-of-lease terms, restoration and access depend on the contract you signed. Reread it early, and get advice if needed.

Appoint a lead and build the inventory

One lead, one budget, one calendar

Designate one person who makes decisions, talks to the movers and building managers, and keeps the calendar. In a larger organization, add one representative per department. Decisions should be written and shared: who packs what, when workstations shut down, who holds the keys.

An inventory by zone

Walk through the premises with the new floor plan. For each room, note the furniture that moves, what stays or gets recycled, heavy equipment (copiers, safes, full filing cabinets) and fragile items. Assign a code (colour or number) to each destination zone and put it on the labels and on the floor plan posted at the entrance. The moving crew will know where each box goes without interrupting you.

Get employees involved

Each employee packs their own workstation: personal documents, small items, and the monitor if the instructions allow it. Hand out boxes, labels and a simple rule (name, zone, workstation number). Set a cut-off time so everything is ready before the crew arrives.

Building rules: elevators, docks and hours

Office buildings almost always regulate moves. Contact building management at both the old and new addresses as soon as the date is set.

What to ask each property manager

  • Permitted hours for moves (evenings, nights, weekends) and blackout periods.
  • Booking the service elevator and loading dock, and their dimensions.
  • Insurance requirements: many managers ask for the mover's liability insurance certificate before granting access. Ask for the exact wording required.
  • Mandatory protection (walls, floors, elevators) and the inspection process before and after.
  • Rules for truck parking and access for heavy vehicles.

Street parking and permits

If the truck has to park on the street, check with your city or borough about permits to occupy the public right-of-way or reserve parking. Rules vary from one municipality to another, and so do processing times.

Moving in the evening or on a weekend

An after-hours move limits disruption to operations. It may, however, be subject to building rules and municipal noise bylaws: check with management and with the city. Also ask the mover how it bills work outside regular hours; to understand pricing models, see the guide on hourly vs flat-rate moving on our sister site (in French).

IT, phones and data: the heart of the project

Furniture can be replaced; a day without email, phones or access to files costs more than everything else. Treat IT as a separate project.

Before the move

  • Order internet and phone lines at the new premises early: installation may require a site visit and cabling. Ask your provider for a written lead time.
  • Check network cabling, electrical outlets and the location of the server room or network cabinet in the new premises.
  • Run a complete, verified backup of servers and workstations before unplugging anything.
  • Photograph how complex equipment is connected and label every cable.
  • Plan call forwarding to cellphones during the cutover.

Transporting equipment

Pack monitors and computers in their original boxes or suitable containers. For servers and network equipment, follow the recommendations of the manufacturer or your IT provider. Ask the mover whether it has experience with IT equipment and how it protects it.

Personal information during the move

Client and employee files often contain personal information. The Commission d'accès à l'information reminds businesses that they must take reasonable security measures to protect this information, given its sensitivity and the medium it is on. During a move, transport confidential files in closed, labelled containers, limit who can access them, and securely destroy documents you are not keeping.

Business continuity: close no longer than necessary

Choose the right strategy

  • All at once: everyone moves the same day, often over a weekend. Easy to communicate, but everything has to work on Monday morning.
  • In phases: departments move one at a time. Less risky, but you manage two addresses for a few days.
  • With temporary remote work: employees work from home during the transition, provided remote access has been tested.

Communicate with clients and suppliers

Announce the new address and moving date ahead of time, then remind people a few days before. Update email signatures, the website, online business listings, invoices and purchase orders. Notify suppliers who deliver on site.

*Fictional example*: a 15-person accounting firm in Laval moves on a Friday evening. Workstations are unplugged at 4 p.m., the network is back up on Saturday, and on Monday each employee finds a floor plan, their extension number and a form for reporting problems.

Changing your business address

Registraire des entreprises

A business registered in Québec must report any change to the information in its file to the enterprise register by filing a current updating declaration. According to Québec.ca, the business has 30 days to do so. Check which addresses appear in your file (domicile, establishments) and update them.

Other agencies and partners

Updating the register does not replace the steps with other agencies, financial institutions and suppliers. Contact Revenu Québec, the Canada Revenue Agency, your financial institution, your insurers and your service providers directly. Businesses can also purchase Canada Post's mail forwarding service when they move. For the usual steps, the Québec change of address checklist is a good starting point.

How do you choose a company for a commercial move?

Ask for a site visit or a detailed description, and compare offers based on the same inventory. Points to check:

  • experience with office moves and commercial buildings;
  • the insurance certificate your property managers require;
  • protection of the goods transported and the procedure if something is damaged;
  • furniture disassembly and reassembly, supply of crates and dollies;
  • the proposed schedule, crew size and number of trucks;
  • change and cancellation terms, written into the contract.

Our guide to choosing a reliable moving company in Québec covers these checks in detail, and the guide to comparing moving quotes helps you put offers side by side. To learn more about this type of job, see our page on commercial moving.

When you are ready, describe your project in the Demenagements.ca request form. Your request is checked, then offered to verified moving companies serving your area, and you choose how many of them may receive your contact details.

Frequently asked questions

How far ahead should you plan an office move?

For a small or mid-sized business, start at least a few months ahead, and earlier if fit-out work or new cabling is needed. Internet lines and elevator bookings are often the items with the longest lead times.

Should an office move happen on a weekend?

It is often the way to limit disruption, but it is not always possible. Building rules, municipal bylaws and your IT provider's availability decide. Also compare what movers offer for those hours.

What is the deadline to update the enterprise register?

According to Québec.ca, a business has 30 days to file a current updating declaration when information in its file changes.

Who packs the workstations?

Usually each employee packs their personal items and documents, and the IT team handles the equipment. The mover can supply crates and pack the rest if the contract provides for it.

Sources

Ready to describe your move?

Share your route, move date and inventory to request free, no-obligation moving quotes.

Request moving quotes →
All guides →